The R132.
A changing route.
A clearer picture.
What is changing along the R132, from Estuary to Malahide Road — and what it means for driving, walking, cycling and buses.
Building the connections
Work continues at the junctions and along the walking and cycling routes.
CompleteApproval
GrantedConstruction
In progressCompletion
Not confirmed

The immediate picture
What to know now
Works programme: 13–27 November 2026.
Seatown: prepare for changes to familiar turns
Seatown’s traffic lights are now planned for the week of 23 November 2026, a week later than the previous programme. A new council leaflet explains the alternative northbound and southbound journeys from Old Seatown Road; see Your journey below.
Crews are finishing drainage and kerbs at Seatown, adjusting line markings at Estuary and surfacing cycle tracks at both junctions. Chapel Lane surfacing and footpath work continues. Temporary one-lane sections may operate outside peak hours, between 10am and 4pm, as required.
Bostik: the traffic signals beside the factory were reported operating by OurSwords’ owner on 13 November.
Local reaction
What people are saying
Councillor Luke Corkery says aspects of the new Estuary junction will be re-examined following reviews. He has called for the council to keep listening to people’s concerns.
Calls for a plan: Councillor Darren Jack Kelly says he joined residents protesting outside Fingal County Council’s offices and has called on the council to set out a clear plan to address their R132 concerns. He said he would raise them again with the council executive.
In the same discussion, one commenter on 11 November said they had left the car at home because walking was quicker.
Earlier public comments on the council’s October updates described severe queues and frustration with the Estuary layout.
- On 20 October, one commenter reported a 25-minute motorcycle trip from Feltrim Road to Balheary at 8.30am, and said buses and a refuse truck struggled with the left turn.
- Another commenter reported about 15 minutes to turn towards the fire station that day.
- In the 30 October discussion, two commenters said they were avoiding Swords while the works continued.
One scheme, different milestones
Junction by junction
Open, with monitoring continuing
The lights began operating on 14 October. After early delays, the council adjusted the timings on 16 October and said traffic flow had improved.
Finishing work and monitoring continue at the junction.
Traffic lights planned for late November
Traffic lights are scheduled for the week of 23 November.
Footpath and cycle-track works continue around the junction.
A further junction conversion
The roundabout beside Pavilions is one of the three junctions to be converted under the scheme.
The circular layout was still visible in our 1 November photographs.
Original OurSwords photographs
Along the R132
Estuary, Seatown and the Malahide Road/Pavilions approaches, photographed on 1 November 2026. Tap a photograph to look closer.
Estuary: the junction and its approaches


Seatown, beside Woodies


Malahide Road and Pavilions


The dated record
How we got here
- Public consultation began
The project entered public consultation.
- Planning application submitted
Detailed proposals moved into the approval process.
- Planning approval granted
An Bord Pleanála approved the scheme.
- Construction began
Murphy International commenced works.
- Estuary signals went into operation
- Estuary timings adjusted
Sequencing changed following initial delays.
- Bostik activation deferred
An issue during final commissioning delayed activation. A revised date was still to be announced.
- Seatown commissioning week announced
The works bulletin scheduled Seatown’s traffic lights for the week of 16 November.
- Seatown commissioning target revised
The latest bulletin plans commissioning for the week of 23 November. OurSwords’ owner also reported the signals beside Bostik operating; their exact activation date was not established.
The wider purpose
Beyond the roundabouts
- Walking & wheeling
New pedestrian infrastructure and crossings along the corridor. - Cycling
Dedicated cycle infrastructure and junction crossing points. - Public transport
Designated bus lanes form part of the planned carriageway changes. - Connections
The scheme runs east of Swords town centre, from the Pinnock Hill area towards Estuary.
When will it finish?
The published programme allows about 25 months of construction from April 2026, pointing to completion in 2028.
Make it useful
Plan around the works
For the wider local picture, open our Swords roadworks and traffic map.
Old Seatown Road: routes in the November traffic leaflet
Fingal’s November leaflet sets out changed journeys for the Seatown junction conversion, with the direct southbound exit from Old Seatown Road and the former U-turn route north no longer available under the new arrangement.
- Going north: head east along Old Seatown Road, turn left onto Estuary Road, then left at the T-junction onto Spittal Hill. Continue past Fingallians to join the R132 northbound at the Estuary traffic lights.
- Going south: head east along Old Seatown Road, turn right onto Estuary Road and continue to the IDA roundabout. Take the second exit onto Seatown Road towards the R132.
Open the council’s route map and November leaflet (PDF). The leaflet gives no separate start date for these restrictions; follow on-site signs as the junction changes are introduced. The existing programme targets the week of 23 November for Seatown’s signals.
Driving
Follow temporary signs and allow extra time when crossing the works. Familiar turns and lane arrangements may change.
Walking & cycling
Use the signed pedestrian routes and temporary crossings.
If you use a wheelchair, buggy or adapted cycle, check that the route suits your journey before setting off.
Taking the bus
Check your stop, direction and departure time before travelling. See our transport guide for journey-planning links.
Our Swords transport guide →OurSwords coverage
More on the R132
Useful questions
Common questions
Does “operational” mean finished?
The Estuary lights are operating, while finishing work continues around them.
What will change on this page next?
Look here for junction opening dates, changes to the works programme and new travel arrangements.
Spotted an error or a new notice?
Email [email protected] with the location, date and what you noticed.
Project backgroundThe R132 scheme, explained
Under construction · checked 13 November 2026. The scheme covers the R132 junctions and the routes between them.
What is being built?
The scheme covers roughly 3km of the R132 east of Swords town centre, from the Pinnock Hill area towards Estuary and Bostik. Its central changes include replacing the Estuary, Seatown and Malahide Road roundabouts with signal-controlled junctions, alongside dedicated walking, cycling and bus infrastructure.
Plans also include new crossings, turning areas and changes to the Drynam Road connection at Malahide Road.
Confirmed timeline
- November 2020: public consultation began.
- May 2021: detailed proposals were submitted for planning approval.
- January 2022: planning approval was granted.
- April 2026: Murphy International began construction.
- 14 October 2026: the new Estuary traffic lights became operational.
- 16 October 2026: signal timings at Estuary were adjusted following early delays.
Current works: bulletin covering 13–27 November
The 13–27 November bulletin plans Seatown’s traffic lights for the week of 23 November, alongside finishing works at Estuary and Seatown, cycle-track surfacing, and surfacing and footpaths at Chapel Lane.
Temporary single-lane sections may operate between 10am and 4pm during these works.
Bostik: the signals beside the factory were reported operating by OurSwords’ owner on 13 November.
What each junction means for your journey
Estuary: the lights are operating; finishing work and timing checks continue. Read the Estuary explainer.
Seatown: traffic lights are scheduled for the week of 23 November. Footpath and cycle-track work continues.
Malahide Road: the roundabout conversion is included in the scheme; the circular layout remains visible in our 1 November photographs.
Completion target and open questions
The published programme points to about 25 months of construction from April 2026, taking the work into 2028.
Next milestones include Seatown’s signals and opening the new walking and cycling routes.
Change log — 25 October 2026: tracker established; 16–30 October bulletin added; Estuary commissioning and timing changes recorded.
Change log — 31 October 2026: current works refreshed to the 30 October–13 November bulletin; planned Seatown commissioning week and Bostik deferral added. Previous versions remain in the editorial record.
Photo update · 1 November 2026: AI reconstruction replaced with original OurSwords.ie photography; Estuary, Seatown and Malahide Road/Pavilions views added. © OurSwords.ie. Reuse requires permission.
Local voices welcome
Have your say.
Keep it kind, useful and local. Your first comment is reviewed before it appears. Community rules